WORLDS FIRST 3-D-Printed Bridge MIDAIR Across FLOWING WATER


///WORLDS FIRST 3-D-Printed Bridge MIDAIR Across FLOWING WATER

The institute for steel structures and the Institute for Structural Mechanic and Design at Technische Universität Darmstadt are in progress to do a first 3D printed steel bridge across flowing water, using Wire-Arc Additive Manufacturing technology
(WAAM) – starting date September 2019.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: