Posts Tagged: Education

Integral Facade Construction

///‘Integral Facade Construction – Towards a new product architecture for curtain walls’ PHD Researcher: Tillmann Klein First Mentor: Prof. Dr. Ing. Ulrich Knaack Second Mentor: Prof. Dr. ir. Mick Eeckhout Period 2006-2012 .

Integral Facade Construction

///‘Integral Facade Construction – Towards a new product architecture for curtain walls’ PHD Researcher: Tillmann Klein First Mentor: Prof. Dr. Ing. Ulrich Knaack Second Mentor: Prof. Dr. ir. Mick Eeckhout Period 2006-2012 .

Heizkraftwerk in Aachen

  The Heizkraftwerk in Aachen is a former power station within the university campus that was converted into a seminar and lecture hall. The concept was to keep the outline and the main structure while giving a new and fresh appearance.

Heizkraftwerk in Aachen

  The Heizkraftwerk in Aachen is a former power station within the university campus that was converted into a seminar and lecture hall. The concept was to keep the outline and the main structure while giving a new and fresh appearance.

Imagine the blog

The Imagine blog is supported by the Imagine Group which is a network of teachers and constructors- of builders, structural engineers and climate designers. The group sees itself as a merger of educational, research and planning institutions working on conceptual

Imagine the blog

The Imagine blog is supported by the Imagine Group which is a network of teachers and constructors- of builders, structural engineers and climate designers. The group sees itself as a merger of educational, research and planning institutions working on conceptual

Bucky Lab

This blog is dedicated to the Bucky Lab from the TU Delft. Within the master course the students design, develop and at the end build architecture and building construction related prototypes. Its a “get your hands dirty” approach in which

Bucky Lab

This blog is dedicated to the Bucky Lab from the TU Delft. Within the master course the students design, develop and at the end build architecture and building construction related prototypes. Its a “get your hands dirty” approach in which